SOFTROBOT AI ERP - PROJECT ASSET ATP MANAGEMENT SCHEDULAR
Construction | HVAC | EPC | Logistics | Equipment Planning | ATP Asset Allocation | Auto Ticket Generation

Total Assets

2,846

Assets In Use

1,782

Idle Assets

412

In Maintenance

163

ATP Shortages

51

Urgent Tickets

18

Project ATP Asset Allocation & Ticket Generation

ASSET CODE ASSET DESCRIPTION PROJECT ACTIVITY REQUIRED DATE TOTAL ASSET IN USE IDLE MAINTENANCE AVAILABLE ATP REQUIRED SHORTAGE ACTION TICKET STATUS
EQ-1001 Hydra Crane 14T Metro Rail Package A Steel Girder Erection 20-May-2026 6 5 0 1 0 2 2 GENERATE RENTAL TICKET OPEN
EQ-1002 Boom Lift 12M Airport HVAC Duct Installation 22-May-2026 10 6 2 1 3 2 0 ALLOCATE IDLE ASSET APPROVED
EQ-1003 Concrete Mixer Machine Industrial Shed Foundation Work 25-May-2026 8 7 0 1 0 3 3 INTER PROJECT TRANSFER OPEN
EQ-1004 Welding Machine 400A Refinery Project Pipe Welding 28-May-2026 40 28 6 2 10 8 0 BLOCK FOR PROJECT COMPLETED
EQ-1005 Forklift 5T Warehouse Expansion Material Shifting 01-Jun-2026 5 4 0 1 0 2 2 OUTSOURCE EQUIPMENT ESCALATED
EQ-1006 Scaffolding Set Hospital HVAC AHU Installation 03-Jun-2026 1500 1200 200 20 280 250 0 ALLOCATE AVAILABLE STOCK READY
EQ-1007 Trailer 40FT Logistics Division Heavy Equipment Transport 05-Jun-2026 14 11 1 1 2 5 3 GENERATE HIRING TICKET OPEN
EQ-1008 Diesel Generator 125 KVA Data Center Project Temporary Site Power 06-Jun-2026 7 5 1 0 2 2 0 PROJECT RESERVATION APPROVED

PROJECT ATP ASSET MANAGEMENT LOGIC

1. ATP (Available To Promise) Asset Logic

AVAILABLE ATP = TOTAL ASSET - IN USE - IN MAINTENANCE

IF AVAILABLE ATP < PROJECT REQUIREMENT
THEN GENERATE SHORTAGE TICKET
2. Asset Allocation Priority

AI allocation sequence:
  • Idle Assets
  • Nearby Site Transfer
  • Return Expected Assets
  • Rental Assets
  • External Vendor Hiring
  • Emergency Procurement
3. Construction Activity Planning

Assets linked with:
  • Project WBS
  • BBU Activity
  • Execution Schedule
  • Manpower Planning
  • Material Delivery Plan
  • Site Readiness
4. Maintenance Blocking Logic

Assets under:
  • Preventive Maintenance
  • Breakdown Maintenance
  • Calibration
  • Fitness Certification
  • Insurance Expiry
are automatically blocked from ATP availability.
5. Auto Ticket Generation

IF SHORTAGE EXISTS:
  • Generate Asset Transfer Ticket
  • Generate Rental Approval Ticket
  • Generate Vendor Hiring Ticket
  • Generate Maintenance Priority Ticket
  • Generate Transport Ticket
6. Logistics Asset Planning

AI tracks:
  • Trailer Movement
  • Vehicle Utilization
  • Fuel Consumption
  • Driver Availability
  • Distance Planning
  • Trip Scheduling
7. Idle Asset Optimization

Idle assets are identified across all projects. AI recommends:
  • Inter-site Transfer
  • Rental Recovery
  • Asset Disposal
  • Maintenance Scheduling
  • Utilization Improvement

ERP SQL ATP Asset Scheduler Logic


SELECT
    ASSETCODE,
    ASSETNAME,
    TOTALQTY,
    INUSEQTY,
    IDLEQTY,
    MAINTENANCEQTY,
    PROJECTREQQTY
FROM ASSETATPMASTER


AVAILABLEATP =
    TOTALQTY
    - INUSEQTY
    - MAINTENANCEQTY


IF AVAILABLEATP < PROJECTREQQTY

BEGIN

    SHORTAGE =
        PROJECTREQQTY - AVAILABLEATP

    GENERATE ASSET TICKET

    IF IDLE ASSET AVAILABLE
        CREATE TRANSFER TICKET

    ELSE
        CREATE RENTAL / HIRING TICKET

END


SCHEDULER RUN:
    EVERY 2 HOURS

AI Asset Management Flow


PROJECT DELIVERY PLAN
            ↓
ACTIVITY WISE ASSET REQUIREMENT
            ↓
ATP AVAILABILITY CHECK
            ↓
SHORTAGE IDENTIFICATION
            ↓
IDLE ASSET SEARCH
            ↓
INTER PROJECT TRANSFER
            ↓
RENTAL / PROCUREMENT
            ↓
TRANSPORT TICKET
            ↓
SITE DELIVERY
            ↓
RETURN / MAINTENANCE
            ↓
ASSET REUSE OPTIMIZATION